| T1-025/RS-02/2026 Dated:12.02.2026 |
Engagement of Consultant for Design review & lnterface validation for Rolling Stock and various systems in regard to UTO operations in Thane Metro & Pune Metro Line-4 |
27 Mar 2026 04:00 PM
|
30 Mar 2026 04:30 PM
|
|
| T1PD-02/2026 Date: 11/02/2026 |
Selection of Consultant for Preparation of Transit Oriented Development Plan, Local Area Master Plan and Multi-Modal Integration Plan for Thane Integral Ring Metro Project. |
16 Mar 2026 04:00 PM
|
17 Mar 2026 04:30 PM
|
|
| T1-024/DDC-03/2025 Date: 12.12.2025 |
Detailed Design Consultancy Services for the Detailed Design of Architectural and Tunnel Ventilation System (TVS) , including SES Simulation and CFD Simulation of Stations and Tunnel; Environmental Control System (ECS); Building Management System (BMS); and E&M Services for two (02) Underground Stations i) Thane Junction and ii) New Thane of the Thane Integral Ring Metro Project (Section Length: Approx 3 km including ramps) |
26 Feb 2026 04:00 PM
|
27 Feb 2026 04:30 PM
|
|
| T1-023/C-02/2025 Date: 25.11.2025 |
Construction of 06 (Six) numbers of Elevated Metro Stations of Thane 2. Dongripada, 3. Vijay Integral Ring Metro Project (1. Manpada, Nagari, 4. Waghbil, 5. Waterfront and 6. Patlipada) |
10 Mar 2026 04:00 PM
|
11 Mar 2026 04:30 PM
|
|
| T1-022/ELE-02/2025 Date: 03.11.2025 |
Modification of 110 KV/220KV EHV M/C overhead lines at A) Ch:14050m near Waghbil station and Kasarwadavali Depot B) 220KV EHV D/C overhead lines at Ch: 20950 between Balkum Naka to Balkum Pada Station, for Thane Integral Ring Metro Project. |
12 Jan 2026 04:00 PM
|
13 Jan 2026 04:30 PM
|
|
| T1PD-01/2025 Date:03/11/2025 |
Selection of Consultant for Preparation of Transit Oriented Development Plan, LocalArea Master Plan and Multi-Modal Integration Plan for Thane Metro Rail Project. |
18 Dec 2025 04:00 PM
|
19 Dec 2025 04:30 PM
|
|
| T1-018/RS-01/2025 Dated:23.09.2025 |
Consultancy for Review & lnterface Validation between Various systems during Tendering Phase with Regard to lmplementation of UTO Operations in Thane lntegral Ring Metro Rail project and Pune Metro Line.4 |
03 Nov 2025 04:00 PM
|
04 Nov 2025 04:30 PM
|
|
| T1-019/Consul-05/2025 Dated: 22.09.2025 |
Engagement of General Consultants for Thane Integral Ring Metro Project. |
28 Jan 2026 04:00 PM
|
29 Jan 2026 04:30 PM
|
|
| T1-016/ELE-01/2025 |
Modification of 110 KV/220KV EHV D/C overhead lines at A) Ch: 11350m near Patlipada Flyover Junction, B) Ch :14050m near waghbil station and C) Ch: 20950 between Balkum Naka to Balkum Pada station, for Thane Integral Ring Metro Project. |
08 Sep 2025 04:00 PM
|
09 Sep 2025 04:30 PM
|
|